Space1999 Swift - Done !
Par olcabour le jeudi, 27 juin 2013, 22:35 - Swift - Lien permanent
As the rest of this assembly, final assembly brought a lot of complications.
- at first, the legs: curiously, they no longer have the same tilt as initially! So disassembly, corrections with pliers and reassembly was needed.
Several small parts were broken, bent and/or broken during these manipulations.
I caught up as better as I could, then repainted to hide the misery. Fortunately, it is in a rather hidden area.
- Same thing for the pipes of the small reactors.
-I will not detail everything, but I had to get out the airbrush few more times thereafter to correct 2/3 assembly goofing... Under another flow of well-chosen swearwords!
Here it is before the installation of the dorsal tanks :
The method to hold the dorsal tanks support plates did not work, so I get back to a more conventional but reliable method: screw!
Catching up some damages.
Before :
After :
Then complete the tiny pipes of the VTOL and side modules
I'm quite proud of the final result
Here it is, exhibited at Geekopolis convention - Paris / May 2013.