Back on this wip after a very long absence.

While the paint was drying, I go into a small scratch Shuttle Tydirium around a blue 2mm micro LED. I reduced 3-view blueprint for a length of 1.2 cm. The metal rods welded on the LED are embedded in the upper wing. They bring electricity from the connector hidden in the hangar bay.

The 2 escort Tie are only 4 mm long. The wings are plastic card, the rest is cross of brass rod welded and some white glue to the central ball.