At the back of the neck, the waste ejector is set up, and the gaps filled.

The assembly of the three main engines is prepared with screws. They will be permanently installed once their lighting done.

In the trenches, lateral support posts covers are done with the remaining parts from the cuts. A brass loop is added to facilitate extraction using pliers.