The hangar bay is built and covered with primer. The small frontal hangar is opened.

I thought there were some bright spots between the tiny ribs, but it was a mistake. The holes that I did for the optical fibers are then sealed with evergren plastic rod.

To bring electricity to the Blockade Runner or Tydirium Shuttle, I install a connector slot from an old computer.
The aluminum cross will be drilled to allow it to go through.

To light the hangar, boxes are built to spread the light through the openings at the top of the vertical side bay walls. The LED are prepared.

Same way to the front opening where the light box is made with evergreen grooved plates to data the illusion of walls of a shed (sorry no photo).

The assembly is reinforced with plastic strips, and with filler glue.